
After a complete renovation of a commissary at the University of New Hampshire, a final inspection had revealed a deteriorated pipe that was under a brand new epoxy floor and ran under some massive machinery. Our team at New England Pipe Restoration was handpicked to undertake the challenging pipe rehabilitation. After we conducted a thorough investigation and cleaning, New England Pipe Restoration had realized that the 4" wye fitting was rotted out. To make matters worse, the only access to the wye was through a floor cleanout, a 90-degree bend, and a 45-degree elbow.
Our team then reached out to Repiper and their T-Liner system to fix the broken wye. In a matter of hours the team successfully completed one of the first Repiper T-liner installations in the United States. Our president of New England Pipe Restoration, Scott Tessier, was ecstatic with the ease and speed of the system. The Repiper team is very impressed by New England Pipe Restoration's execution and professionalism, and we are all looking forward to our next T-liner project using the Repiper’s innovative system.
Check out the video:
More photos below:






Offering Trenchless Pipe Repair & Pipe Restoration to all of New England.


